This article describes the evolution of a project over the course of a year. This project has not been the only, or main focus of the team. I want to describe the process in terms of the Capability Maturity Model. The CMM is intended for organisational effectiveness, but is easier to discuss in a smaller setting.
Here are the stages:
Not all projects will achieve the higher levels. It's an improvement process rather than a strict destination.
The key steps are:
The later section includes the term Railway oriented programming. This is a technique to allow a process to recover from an error. The classic approach when an error happens is to store the result somewhere (a log) and just fail. Railway oriented programming allows attempts to recover at various steps (after having stored the error). This makes for a more stable system.
The team that I now lead had inherited a project shortly before I took over as the team lead. I am going to call it Project A to keep it anonymous.
Project A consists of a dozen services. Whether these count as microservices is another matter (they are independently deployable, theoretically replaceable, and use a combination of RabbitMQ and REST to communicate).
The team had previously been under instructions not to spend more time than absolutely necessary on Project A as they had other important things to work on.
The team does not understand the project. Errors are resolved by restarting one of the services. The team had added automated build triggers to rebuild the services every day.
Errors are found by support incidents being raised. Most of our users are in another timezone so problems are typically reported at the end of the working day.
On one Tuesday afternoon we were told by our users that Project A had not been sending out regular emails since the weekend. Project A integrates with an external third party system and sends out emails notifying of changes that the user is interested in.
We start by looking at our logs: We have no errors. We also have no warnings. We have lots of info messages.
Our logs were being sent to Datadog. It was shortly after this that we found that you need to provide a status code to Datadog in order for it to correctly segregate the messages. Without this everything is Info.
I like to document systems using graphviz. This is a compiler that allows generation of images from source code:
There are samples for this here: Sample Readme This is a template that I use across all of these services. Note that as it is a private repository certain details can be included that would not be appropriate for a public repository.
I started using graphviz to draw data flow diagrams for each of the services in Project A. These were checked into source control alongside the projects.
The idea of the data flow diagram is to follow the chain of data use through the system. Items to the left feed data to items on the right. Each service in Project A was documented with the items to the left and right of it. More recently I have adjusted some of the diagrams to have items that are peers (two way communication) be at the same horizontal postion.
The initial diagrams were crude, and somewhat inaccurate (some of the items had the flow going the wrong way, other subtle links were missing). However to quote Simon Wardley "all maps are wrong, some of them are useful".
They are diagrams since they have a key and are maps because direction is meaningful.
By working through the services we found that we were not receiving any inputs. The third party had changed their login process. We found a notification of this hidden on the updates section of their website in a three month old article!
It took us a couple of days to fix up the login process and to restore the functions of Project A
We now had a basic understanding of the components of the system. We managed to fix the Datadog logging and now had the logs correctly split by category. Errors were still reported by our users.
We started to fix the error levels of the messages, and found that some of the errors were merely informational and could be downgraded. Others needed more details, in particular the ability to trace the specific input to the source message or to store a file that could not be sucessfully parsed.
We added Dependabot to all of our projects to assist with upgrades. This allows us to keep on top of the security and other changes to the libraries that we depend upon.
We started to get complaints that our users were not receiving emails. This was odd as we could see in the logs that some emails were being sent out.
We used Datadog to produce a dashboard that produces graphs of both the signals that an email should be sent along with a list of the number of emails actually sent. This was enough for us to see that while we were sending some emails, it was significantly lower than expected.
One of our internal services had changed its contract and one of the services could not cope with the new shape of the data. This did not take long to solve or isolate given the now improving diagrams.
We now started to reduce the most frequent group of errors whenever we had a quiet time. Datadog has a great option to detect patterns in the logs and create groups out of them. These form obvious targets for reducing the errors. We started adding alerts for specific problems to ensure that we know about a problem before the users tell us.
We were still occasionally getting problems reported just before hometime on a Friday. Solving these is much quicker now.
Our QA while testing a change noticed a message on a database dashboard. The database service that we were using for eight of the services is being decommissioned in 6 months time. We fairly quickly find that four of the databases are actually only used for locking and were able to replace them with AWS Lambdas. The remaining four we eventually migrated.
The diagrams are getting more accurate by this point.
We added integration tests to check that the access codes that we needed for each remote service were still accurate. This means that the tests will be broken first thing on Monday morning, allowing us to fix things before our users need the data.
One of the services used AWS S3 to store messages that could not be parsed. Expanding this to other parts of the service greatly assisted fixing (or at least quieting) some strange errors.
One of the services was responsible for querying an external service (which had over 200 instances). At any given time some of these were broken (2% to 5%, but not always the same one). For a while, we were moving the broken feeds to use a less effictive secondary service manually. This required us to remember to restore the feeds once they had recovered. These external services are also undergoing a slow (four year so far, and only half complete) rolling upgrade process which means that they can break at the start of a given day (typically a Monday).
The first attempt to standardise this involved having a test check each feed each day and report those that were broken. This was good at spotting broken items, but made fixing them labour intensive.
The second attempt was better: use railway oriented programming. This is a technique which models the success and error conditions as two parallel railway tracks. An error shunts the train onto the error track. If it remained there then this would be normal error handling. The railway trick is to have corrective processes that can restore the train to the main track. In our specific case, this meant changing the error handler of the primary feed to call the secondary feed should an error occour. This allowed us to cater for unreliable feeds for the small price of one service being able to call another. This small change eliminated 30% of the daily errors!
I use a three level approach for logs. Errors are for things that the system cannot correct for itself. Warnings are for things that may be wrong, but could just be expected and incomplete. Information messages are the background items that show you that the system is functioning, and give you an easier time to locate a problem when viewed in context.
The diagrams are now far more accurate. We now remove the most frequent error each day (and are now starting on the warnings). Project A is far more stable than ever. The diagrams make finding problems far easier and help explain the system to new arrivals on the team.
We have started to find other parts of the systems that we support that we want to give the same treatment to (one of the user interface components still has one level logs).
We try to keep an active eye on what is going to need to be upgraded so we can plan it carefully.
Fixes are applied slowly. Fix one new thing each day and you will make a lot of progress, and know the cause of any side effects.
Project A still has a few rough edges, but we have made a lot of progress. This has not been our main focus for all of the year, it only becomes important when something breaks.
We generally spot the errors before the users now.
We are not at level 5 yet!
Understand any system that you have to support. Graphviz is a great way to document this knowledge. Datadog has a lot of powerful tools that will help, if you can make your logs work with it. Actively monitor your system especially after any significant change. Keep an eye on the logs to know what is normal, and see what the system is trying to tell you.
Software is our passion.
We are software craftspeople. We build well-crafted software for our clients, we help developers to get better at their craft through training, coaching and mentoring, and we help companies get better at delivering software.